Zhejiang Geely to New Materials Co., Ltd.
- Qual&Honor:
- 0
- Identification:
- To be Identified
- Industry:
- Used smelting equipment
- Location:
- Zhejiang
- Business Scope:
Disposal of idle hand metal powder reduction furnace
- Info ID:
- 9374112
- Product:
- Disposal of idle hand metal powder reduction furnace
- Area:
- Zhejiang
- Price:
- telephone or negotiable
- Release date:
-
Wangyou,Higher intergrity.Membership rights
Product introduction
- Equip model:
- RSH-70-9Q
- quality:
- Reconditioned
- DeviceStatus:
- normal use
- StorageMode:
- Warehouse storage
- Number:
- 1
- Position:
- Zhejiang
RSH-70-9Q metal powder reduction furnace (push the boat) from Nanjing constant over the company in May 2003 Powder Metallurgy Furnace production. Parameters: rated power 70Kw, phase number 3-phase, temperature zone four District, the voltage 380V, maximum use temperature of 900 degrees, no-load heating time, is less than 12 hours, the chamber size :: (LWH) 5200 × 560 × 75mm, shape Dimensions: (LWH) 12000 × 1500 × 1540mm. Weight of about 8 tons. There are instruction manual. Due mesh belt furnace, the backlog is now used, use less than 10 times. There with ammonia decomposition furnace, QA2-15 Cube, 18Kw. P>
Leave Message
One-Click:
Mobile:
Verification Code:
Latest comments
Zhejiang Geely to New Materials Co., Ltd. other products
more
- Selling 50kg hot stove
- Selling inventory powder pusher sintering furnace and ammonia decomposition equipment
- Disposal of your old ZJ20X-1 induction heater
- Selling FK-3 powder molding Machine
- Processing inventory second-hand vacuum hot pressing furnace
- Selling second-hand volumes mesh welding mesh Separation Fence
- Selling second-hand Compound Crusher
- Selling Compound Crusher
Disclaimer: the above display information provided by the members themselves, the authenticity of the content, accuracy and validity of release of the member responsible for, China used equipment net(www.fengj.com) does not assume any liability. To avoid the risk of purchase, recommend that you purchase related products must be confirmed before the supplier qualification and product quality.